It is the final week of the project and the luminaire is ready and working. Below are pictures of the white LED's attached to the heat sink, the white LED's lit from the heat sink, and one completed side of the luminaire with the attached RGB LED's. Also attached are two videos showing the completed luminaire in action. We did not fill out the other two sides of the luminaire with RGB LED's because there was a short in the second side and we did not want to move on until we fixed the problem.